An inscription carved into the wall of Hezekiah's water tunnel records the moment the two digging crews met as they tunneled toward each other from opposite ends.

The evidence

In 1880, workers clearing the Siloam Tunnel in Jerusalem discovered an ancient Hebrew inscription carved into the tunnel's limestone wall. The inscription, now held in the Istanbul Archaeology Museums, documents a moment of breakthrough in one of the ancient world's most ambitious engineering projects. It reads in part:

When the tunnel was driven through. And this was the manner of the breakthrough: While the laborers were still lifting up the pick, each toward his fellow, and while there were still three cubits to be bored through, there was heard the voice of one calling to the other that he had lifted up the pick. And on the day of the breakthrough the laborers struck, one toward the other, pick against pick. And the water flowed from the spring to the pool for a thousand cubits.

The inscription provides a direct witness to the engineering technique: two crews began digging from opposite ends of the tunnel and worked toward each other, eventually breaking through and connecting the flow of water from the Gihon spring to the Pool of Siloam. The text captures the physical moment of meeting and the triumph of the completed project.

The tunnel itself — a 533-meter channel carved through bedrock beneath Jerusalem — was designed to secure the city's water supply inside its walls, protecting it during siege. The inscription's Hebrew and script have been studied extensively, and the project is attributed to the time of Hezekiah, the eighth-century Judean king. Archaeological work by Ronny Reich and Eli Shukron, documented in Israel Exploration Journal excavation reports, has examined the tunnel's construction and dating.

The artifact directly corroborates the biblical record that credits Hezekiah with this engineering achievement and provides the only ancient near-Eastern inscription of its kind that describes the actual moment of completion in the words of those who carried it out.

Sources
  1. Siloam Inscription, Istanbul Archaeology Museums, Jerusalem excavation 1880Artifact
  2. Hallo, W. W. & Younger, K. L. (eds.), The Context of Scripture 2.28: Ancient Near Eastern Literature and HistoryBook
  3. Smelik, K. A. D., Writings from Ancient Israel: A Handbook of Historical and Religious Documents (Westminster/John Knox Press, 1991)Book
  4. Reich, R. & Shukron, E., excavation reports and analysis, Israel Exploration JournalJournal
What this shows

The inscription corroborates that Hezekiah commissioned a major water tunnel project in Jerusalem and records the moment the two construction crews met. It provides the only ancient near-Eastern firsthand account of such a tunneling project and its breakthrough.

What this does not prove

The inscription does not prove the biblical narrative of Hezekiah's reign or his other acts. It does not date the tunnel to a specific year or establish the broader political and military circumstances surrounding its construction that the biblical text describes.